In Szczecin, the old bridge structure has already been demolished on the Cłowy Bridge construction site. Currently, preparations are underway for the excavation of abutments. The work is being carried out by a consortium of Vistal Gdynia S.A. and Vistal Infrastructure Sp. z o.o.
![](https://www.vistal.pl/wp-content/uploads/2017/01/Cłowy-Szczecin-GW-1-1.jpg)